Facilities Planning
Facilities Design and Construction Guidelines (FDCG)
Introduction
This Facilities Design and Construction Guidelines (FDCG) document is a summary of procedures and
standards for the construction, remodeling or alteration of the Contra Costa Community Colleges District
(CCCCD) facilities and infrastructure. It is intended to direct consultants, facilitate coordination and
improve communication among the design team(s) and all CCCCD departments involved in the design
and construction phases of facilities.
The FDCG document consists of guidelines in Part I, and general material and methods specifications in
Part II. The guidelines provide insight to CCCCD's operation and maintenance objectives and their
implication upon facilities design. The specifications provide direction regarding materials, systems and
equipment preferred by the CCCCD. It should be noted that the appropriateness of all systems equipment
and materials specifications is still the responsibility of the consultant.
These guidelines provide consultants with information such as general administration and design
considerations, performance criteria, materials and equipment specifications, acceptable manufacturers,
installation and testing procedures, etc. It must be underscored that these are not "Guide or Boilerplate
Specifications" and are not intended to substitute for standard project specifications. Also, these
guidelines do not address every aspect of design considerations; those are the responsibility of the
consultant subject to the CCCCD's review and approval process outlined herein.
The consultant has the obligation to request variances whenever the exercise of professional judgment or
regulatory implications would lead to a conclusion different from the one(s) outlined or suggested herein.
All proposed variations and deviations from these guidelines must be approved in writing by the CCCCD's
Project Manager before incorporation into the project.
Guidelines and standards change from time to time as new methods and procedures are implemented.
Each consultant is responsible for determining the appropriateness of any revisions to the project for
which he is retained.
Design and Construction Guidelines -
Table of Contents
Design and Construction Guidelines -
Complete Manual (PDF 5,109KB, 247 pages)
|